220 kV Transmission System Studies – MCEN District

Client:  Antofagasta Minerals
Year:  2024
Location:  Minera Centinela District, Antofagasta Region
Electrical engineering project in Chile – 220 kV Transmission System Studies MCEN District
Category
Studies
Start year
2024
Client
Antofagasta Minerals
Location
Minera Centinela District, Antofagasta Region
Project description

Comprehensive analysis of the 220 kV transmission and transformation system of the Minera Centinela district (MCEN), considering system robustness, transient stability, short-circuit, and power flow studies.

Esinel Engineers scope

Modeling of the district’s 220 kV transmission system, power flow studies under normal and contingency conditions, transient stability analysis, short-circuit calculations, and evaluation of system robustness under mining expansion scenarios.