Participation in the capacity increase of the 1×220 kV Charrúa–Temuco line, a strategic asset for the National Electric System (SEN), which connects southern generation with the country’s central zone.
Technical site inspection during the capacity increase activities, verification of compliance with transmission line technical specifications, quality control of field interventions, and coordination with project stakeholders to ensure continuity of electrical service.
Other electrical engineering projects in Chile developed by Esinel Engineers in this category.