Sectionalizing of the 2×220 kV Lagunas–Encuentro Line

Client:  Frontera Project
Year:  2024
Location:  Frontera Substation, Antofagasta Region
Electrical engineering project in Chile – Sectionalizing of the 2×220 kV Lagunas–Encuentro Line
Category
Technical Site Inspection
Start year
2024
Client
Frontera Project
Location
Frontera Substation, Antofagasta Region
Project description

Work carried out at Frontera Substation, Antofagasta Region, which makes it possible to intercept the 2×220 kV line connecting the Lagunas and Encuentro substations, enabling new connection points in the transmission system.

Esinel Engineers scope

Technical site inspection of the sectionalizing works, verification of yard equipment installation, supervision of insulation and continuity tests, quality control of connections, and coordination with the system operator for commissioning.