Project description

Feasibility and detailed engineering development for the high-voltage transmission system of the Nueva Escondida PL2SR 69 kV project, at the Class 3 Selection Phase stage.

Esinel Engineers scope

Engineering development focused on the high-voltage transmission system of the NEHVTI project, considering technical criteria for the safe connection and operation of the electrical infrastructure associated with the project.