Highlighted Projects

  • 2024
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018
  • 2017
  • 2016
  • 2015
  • 2014
  • 2013
  • 2012
  • 2011
  • 2010
  • 2009
  • 2008
  • 2007
  • 2006
  • 2023

    Engineering for Primary Sulfide Enablers CMZ: HATCH
    Civil Design for Section No. 3 HVDC Line 600 kV: CONEXIÓN
    Engineering for STE Project C20+ Collahuasi: BECHTEL/COLLAHUASI
  • 2022

    Feasibility Study for the Expansion of Quebrada Blanca: BECHTEL/TECK
    Engineering for HVDC Converter Substations 600 kV Lo Aguirre-Kimal: GEDI
    Group 2, DS 185/21 Don Goyo-La Ruca-Ovalle: BESALCO/CEN
  • 2021

    Pre-Feasibility Study for 220 kV System at Quebrada Blanca: BECHTEL/TECK
    New Substation Parinas 500 kV and 2x500 kV Line Parinas-Likantai: ABENGOA/CEN
    Design of Foundations for HVDC 600 kV Line: TRANSELEC
  • 2020

    Audit of Primary Distribution Substations: ENEL
    FEL2 and FEL3 Engineering. Expansion of 220 kV Electrical System: COLLAHUASI
    Sol de los Andes Photovoltaic Park: EIFFAGE
  • 2019

    Santa Isabel Photovoltaic Park 220/23 kV: ISOTRON
    Systemic Studies for Future Expansions Collahuasi: COLLAHUASI
    Inspection of Construction 220 kV Pascua Lama Line: BARRICK
  • 2018

    Alto Melipilla Substation 220 kV: GE/CEN
    ITO Lo Aguirre Substation 500 kV: COBRA/CEN
    Cerros de Huichahue Substation 220 kV: EFACEC/CEN
  • 2017

    ITO Laberinto, El Cobre, Tesoro Substations: SIEMENS/CEN
    Seawater Pumping System 220/69/6.6 kV: TEDAGUA
    2nd Circuit Sectioning Line at Lo Aguirre Substation 500 kV: COBRA/CEN
  • 2016

    Expansion of Lo Aguirre Substation: ALSTOM
    ITO Cumbres and Changos Substations 500 kV: ALSTOM
    ITO New Cardones, Maitencillo, Pan de Azúcar Substations 500 kV: SIEMENS/CEN
  • 2015

    Sierra Gorda Wind Farm: EIFFAGE
    Spencer Growth Option (SGO), 220 kV Lines and Substations: FLUOR/BHP
    Engineering for OGP1 Project (Lines and Substations): : BHP
  • 2014

    Electrical Supply for Collahuasi Expansion: BECHTEL
    Luz del Norte Photovoltaic Project: BBOSCH
    Charrúa 220 kV Substation Expansion: SIEMENS
  • 2013

    Caserones Project Pre-Commissioning: CASERONES
    Expansion of Substations Expansion Plan DS-115: SIEMENS/CEN
    Agua Santa 220 kV Substation Inspection: CHILQUINTA
  • 2012

    Andean Electrical System Studies: CODELCO ANDINA
    Detailed Engineering for Lines and Substations Project OGP1: BECHTEL/BHP
    Technical Inspection (ITO) of 220 kV Pascua Lama Line: BARRICK
  • 2011

    Technical Inspection (ITO) of Construction Lines and Substations 220 kV. Improvement of Electrical Infrastructure Collahuasi: COLLAHUASI
    Feasibility Study for the Construction of 2x220 kV Line for Binational Project Pachón: BECHTEL
    Autotransformer 500/220 kV S/E Charrúa: HYOSUNG/TRANSELEC
  • 2010

    Technical Inspection (ITO) of Construction Lines and Substations 220 kV Salar-Calama: EMEL
    Engineering of Lines and Substations. Expansion of 220 kV System: COLLAHUASI
    Technical Inspection (ITO) of Construction Lines and Substations 220 kV Salar-Calama: EMEL
  • 2009

    Static Capacitor Bank. Substation Polpaico: ABB/TRANSELEC
    Basic Engineering of Lines and Substations System 220 kV: COLLAHUASI
    Expansion of Chacaya Substation 220 kV: SIEMENS/EMEL
  • 2008

    Interconnection Main Substation 220 kV. Mantos Blancos: MANTOS BLANCO
    Engineering Construction Lines and Substations 220 kV. : ANGLO AMERICA
    Los Pelambres Transmission Lines : BECHTEL/PELAMBRE
  • 2007

    Technical Inspection (ITO). Construction Line and Substation Pozos Norte: COLLAHUASI
    Phase 1 Expansion Andina 220 kV: SIEMENS/ANDINA
    Capacitor Bank S/E Agua Santa: ABB/CHILQUINTA
  • 1st CONTRACT Awarded

    Conceptual Engineering Electrical Supply Pozos Norte: COLLAHUASI
    Basic Engineering Electrical Supply Pozos Norte: COLLAHUASI
    Engineering and Procurement Management Electrical Supply Pozos Norte: COLLAHUASI
Proyectos asociados a Sistemas de Transmisión de Energía de CHILE.
Highlighted Project
transelec

The activities covered primarily involve reviewing, conducting engineering, and technical studies for projects associated with Chile’s Energy Transmission Systems.

Services are provided in the following specialties:

If necessary, management with relevant sector authorities (CEN, DGA, DGAC, MOP, DGA, DOH, CMN, SEREMIAS, DOM, etc.) is considered to obtain the corresponding authorizations for the final delivery of the engineering. Designs adhere to national standards and regulations, as well as international recommendations or standards. Technical regulations and current Chilean legislation regarding high, medium, and low voltage electrical installations, seismic aspects, safety for personnel and equipment, construction, and environmental regulations are considered, along with any other applicable design standards in effect at the time of service execution.

Contact us
Especialidad Líneas de Transmisión